Skip to content
cropped-jordan_gazette_logo_1-removebg-preview.png

Primary Menu
  • Home
  • Jordan
  • Business
  • Lifestyle
  • Companies news
  • Submit A Press Release
Light/Dark Button
Subscribe
  • Home
  • Companies News
  • RTA Completes Traffic Expansion Works on Al Warqa’a 1 Street in Both Directions from Sheikh Mohammed Bin Zayed Road to Ras Al Khor Road
  • Companies News

RTA Completes Traffic Expansion Works on Al Warqa’a 1 Street in Both Directions from Sheikh Mohammed Bin Zayed Road to Ras Al Khor Road

Four Roundabouts to be converted into Signalised Intersections Dubai. Roads and Transport Authority. 7th January 2026: Dubai's Roads and Transport Authority (RTA) has completed traffic expansion works on Al Warqa'a 1 Street, covering a total length of 7 km in both directions, from Sheikh Mohammed Bin Zayed Road to Ras Al Khor Road. The scope of works included the conversion of four roundabouts into smart signalised intersections, contributing to an improvement in traffic flow of up to 30%. These efforts reflect RTA's standing commitment to enhancing the efficiency of the local road network, supporting smoother daily mobility, and improv
Mahdeehassan 4 months ago (Last updated: 4 months ago) 3 minutes read
RTA Completes Traffic Expansion Works on Al Warqa'a 1 Street in Both Directions from Sheikh Mohammed Bin Zayed Road to Ras...

Four Roundabouts to be converted into Signalised Intersections

<a href="https://jordangazette.com/dubai-customs-explores-prospects-for-future-logistics-operations-with-dhl/”>Dubai. Roads and Transport Authority. 7th January 2026:

Dubai’s Roads and Transport Authority (RTA) has completed traffic expansion works on Al Warqa’a 1 Street, covering a total length of 7 km in both directions, from Sheikh Mohammed Bin Zayed Road to Ras Al Khor Road. The scope of works included the conversion of four roundabouts into smart signalised intersections, contributing to an improvement in traffic flow of up to 30%. These efforts reflect RTA’s standing commitment to enhancing the efficiency of the local road network, supporting smoother daily mobility, and improving residents’ quality of life.

The traffic expansion works  also included an integrated package of solutions, comprising the construction of advanced stormwater drainage networks with a total length of 6,600 linear metres, the installation of 324 lighting poles equipped with modern street-lighting systems, and the provision of 111 new parking spaces. In addition, pedestrian pathways were developed across a total area of 41,000 square metres, contributing to improved traffic flow and enhanced safety for all road users.

Hamad Al Shehhi, Director of Roads at Traffic and Roads Agency, RTA, said, “This project builds on works completed by RTA in June 2025, which included the construction of direct entry and exit points to Al Warqa’a from Sheikh Mohammed Bin Zayed Road to facilitate smoother access to and from the area. It also encompassed traffic improvement works on 13th Street in Al Warqa’a 1, extending approximately 8 km in both directions, to serve Al Warqa’a residents and school users, as part of the project to develop the internal road network in the area.

Al Shehhi added: “RTA is firmly committed to developing integrated infrastructure encompassing road networks, street lighting, and stormwater drainage systems, in line with Dubai’s population and urban growth targets. These efforts respond to residents’ aspirations for an advanced urban environment and support Dubai’s vision as a smart and prosperous city that places quality of life and residents’ happiness at the forefront of its priorities.”

“The development projects currently being implemented by RTA in Al Warqa’a area include upgrading the internal road networks in Al Warqa’a 3 and Al Warqa’a 4. The scope of works involves road paving, the construction of pedestrian pathways and pavements, and provision of parking spaces, in addition to development of cycling tracks. These projects aim to enhance connectivity with cycling routes in neighbouring areas and support alternative and sustainable mobility options.”

RTA held an interactive session last October with residents and visitors of Mirdif and Al Warqa’a to brief the public on the latest developments of Dubai Metro Blue Line project within their residential areas. The session also reviewed RTA initiatives to develop and enhance the road network, highlighting ongoing efforts to improve residents’ satisfaction and facilitate daily mobility.

The session discussed several key topics, most notably the traffic diversions scheduled to be implemented in Al Warqa’a and Mirdif during the various phases of the project. This approach reflects RTA’s commitment to direct engagement with citizens, residents, and visitors across Dubai by keeping them informed of project updates, listening to their feedback and needs, and transforming them into practical solutions that contribute to improving the quality of life.

Tags: Dubai's Project Residents Roads Street Traffic Warqa'a Works

Post navigation

Previous: UAE Team Emirates-XRG Rounds Off Historic 2025 With International Recognition
Next: ORIS Hölstein 1904 Year of the Horse

Related Stories

imgi_31_SBCSM_Tbilisi 26_Agenda Overview PR_1024x512px
  • Business
  • Companies News

SBC Summit Tbilisi to Map Path to Growth for Gaming Companies Across Eastern Europe and Central Asia

Mahdeehassan 21 hours ago
PR Photo
  • Business
  • Companies News

CNTXT AI Introduces Munsit Edge, Bringing Private, Real-Time Arabic Speech AI to Phones, Cars, and Smart Devices

Mahdeehassan 21 hours ago
PR Photo
  • Business
  • Companies News

CNTXT AI introduces Munsit Emirati TTS, the most accurate native Emirati voice model, setting a new benchmark for Arabic speech

Mahdeehassan 3 weeks ago

    You May Have Missed

    Here's What Those Tiny Holes On Your Earbuds Are For - here's what
    • Business

    Here’s What Those Tiny Holes On Your Earbuds Are For

    Mahdeehassan 10 hours ago
    NASA Once Tricked Its Own Government By Hiding An SR-71 In Plain Sight - nasa once
    • Business

    NASA Once Tricked Its Own Government By Hiding An SR-71 In Plain Sight

    Mahdeehassan 12 hours ago
    5 Pickup Trucks From The '60s That Look Even Cooler Today - pickup trucks
    • Business

    5 Pickup Trucks From The ’60s That Look Even Cooler Today

    Mahdeehassan 13 hours ago
    This Is When It Makes Sense To Start A Manual Car In Second Gear - when makes
    • Business

    This Is When It Makes Sense To Start A Manual Car In Second Gear

    Mahdeehassan 14 hours ago

    Categories

    • Business (1,113)
    • Companies News (1,237)
    • Jordan (100)
    • Lifestyle (105)
    • MENA Business (18)
    • Homepage
    • Privacy Policy
    • Terms & Conditions
    Jordan Gazette © {2026} All rights reserved. | ReviewNews by AF themes.