RTA Completes Al Rowaiyah Street, Enhancing Connectivity Between Sheikh Mohammed bin Zayed Road and Sheikh Zayed bin Hamda...

RTA Completes Al Rowaiyah Street, Enhancing Connectivity Between Sheikh Mohammed bin Zayed Road and Sheikh Zayed bin Hamdan Al Nahyan Street

Project Highlights Serves Dubai Silicon Oasis and Nadd Hessa Increases capacity on Sheikh Zayed bin Hamdan Al Nahyan Street by 40% Reduces travel time to Sheikh Mohammed bin Zayed Road by 60%, from 10 to 4 minutes Dubai. Roads and Transport Authority. 17th February 2026: Dubai’s Roads and Transport Authority (RTA) has completed Al Rowaiyah Street, extending 3.5 km, directly linking Sheikh Mohammed bin Zayed Road with Sheikh Zayed bin Hamdan Al Nahyan Street near Dubai Silicon Oasis and Nadd Hessa. The project provides direct entry and exit points to both arterial roads, serving Nadd Hessa residential area, Dubai Internationa

Editorial Team  |   |  5 mins read
Read Full Story →
RTA Delivers 67 Rapid Traffic Improvements in 2025, Plans a Further 45 in 2026 - delivers rapid

RTA Delivers 67 Rapid Traffic Improvements in 2025, Plans a Further 45 in 2026

12 traffic improvements serving more than 30 schools in Dubai An estimated 45% reduction in travel time in the areas where improvements were implemented A 33% increase in vehicle capacity on several streets thanks to the improvements Dubai. Roads and Transport Authority. 28th January 2025: Dubai’s Roads and Transport Authority (RTA) completed 67 rapid traffic improvement measures across various areas of the emirate in 2025. These included 46 enhancements at key locations along major arterial roads and within residential areas, 12 improvements in school zones, and nine traffic enhancements across development areas. This achievem

Mahdeehassan  |   |  6 mins read
Read Full Story →
RTA Opens Phase I of Hessa Street Development Project Linking Al Khail Road and Sheikh Zayed Road - opens phase

RTA Opens Phase I of Hessa Street Development Project Linking Al Khail Road and Sheikh Zayed Road

Overall Project Progress Reaches 90% Al Tayer: All road works, bridges, intersections, and cycling tracks are scheduled for completion and opening in the second quarter of this year The project includes the development of four major intersections and the widening of Hessa Street to four lanes in each direction over a 4.5 km stretch The project will double Hessa Street’s traffic capacity A 13.5 km cycling track will be delivered, featuring two dedicated bridges for cyclists and pedestrians, one crossing Sheikh Zayed Road and the other crossing Al Khail Road Dubai. Roads and Transport Authority. 11th January 2026: Dubai’s

Mahdeehassan  |   |  4 mins read
Read Full Story →
RTA Completes Traffic Expansion Works on Al Warqa'a 1 Street in Both Directions from Sheikh Mohammed Bin Zayed Road to Ras...

RTA Completes Traffic Expansion Works on Al Warqa’a 1 Street in Both Directions from Sheikh Mohammed Bin Zayed Road to Ras Al Khor Road

Four Roundabouts to be converted into Signalised Intersections Dubai. Roads and Transport Authority. 7th January 2026: Dubai’s Roads and Transport Authority (RTA) has completed traffic expansion works on Al Warqa’a 1 Street, covering a total length of 7 km in both directions, from Sheikh Mohammed Bin Zayed Road to Ras Al Khor Road. The scope of works included the conversion of four roundabouts into smart signalised intersections, contributing to an improvement in traffic flow of up to 30%. These efforts reflect RTA’s standing commitment to enhancing the efficiency of the local road network, supporting smoother daily mobility, and improv

Mahdeehassan  |   |  3 mins read
Read Full Story →
RTA Completes 60% of Oud Maitha Road and Al Asayel Street Development Project - completes maitha

RTA Completes 60% of Oud Maitha Road and Al Asayel Street Development Project

Al Tayer: Project includes the development of four major intersections, construction of bridges and a tunnel spanning 4.3 km, and new roads extending 14 km Project enhances connectivity between Al Asayel Street and Al Khail Road Upgrade increases Oud Maitha Road capacity by 50% Project supports key service facilities and residential areas with a projected population exceeding 420,000 by 2030 Dubai. Roads and Transport Authority. 4th January 2026: Dubai’s Roads and Transport Authority (RTA) announced that 60% of Oud Maitha Road and Al Asayel Street development project has been completed as part of the Sheikh Rashid Corridor

Mahdeehassan  |   |  5 mins read
Read Full Story →
RTA Opens Two Bridges as Part of Trade Centre Roundabout Development - opens bridges

RTA Opens Two Bridges as Part of Trade Centre Roundabout Development

New Bridges Improve Traffic Flow From 2nd December Street Towards Sheikh Rashid Street and Al Majlis Street Al Tayer: Project works progress ahead of schedule to ease mobility for residents Project scope covers extending bridges by 5,000 metres and converting the roundabout into an at-grade intersection Completed bridges reduce journey time from 10 minutes to 2 minutes Average delay at the intersection drops from 12 minutes to 90 seconds Project serves Dubai World Trade Centre, Dubai International Financial Centre, Downtown Dubai, and residential and development areas accommodating over 500,000 residents and visitors Projec

Mahdeehassan  |   |  5 mins read
Read Full Story →
RTA Awards Contract for Sheikh Zayed bin Hamdan Al Nahyan Street Intersection Development with Al Awir Road and Al Manama ...

RTA Awards Contract for Sheikh Zayed bin Hamdan Al Nahyan Street Intersection Development with Al Awir Road and Al Manama Street

Works include the construction of 2,300 metres of bridges Al Tayer: “The project will increase road capacity by 176% and reduce travel time from 20 minutes to five” Dubai. Roads and Transport Authority. 14th December 2025: In line with the directives of the wise leadership to enhance the infrastructure of the road network and public transport systems to meet the requirements of urban development, population growth, and improve quality of life, Dubai’s Roads and Transport Authority (RTA) has awarded the Contract for Sheikh Zayed bin Hamdan Al Nahyan Street Intersection Development with Al Awir Road and Al Manama Street.

Mahdeehassan  |   |  4 mins read
Read Full Story →